aboutsummaryrefslogtreecommitdiff
path: root/qapi-schema.json
diff options
context:
space:
mode:
authorPaolo Bonzini <pbonzini@redhat.com>2012-07-23 15:15:47 +0200
committerKevin Wolf <kwolf@redhat.com>2012-10-24 10:26:19 +0200
commita66a2a368383e627b929bf42d1b972822491404b (patch)
treefcec5bb544b797dcb2e7b40929bf304311e0c86a /qapi-schema.json
parentaeae883baf2377b714a41529f94905046fa058f3 (diff)
block: introduce BLOCK_JOB_READY event
Even for jobs that need to be manually completed, management may want to take care itself of the completion, not requiring the user to issue a command to terminate the job. In this case we want to avoid that they poll us continuously, waiting for completion to become available. Thus, add a new event that signals the phase switch and the availability of the block-job-complete command. Signed-off-by: Paolo Bonzini <pbonzini@redhat.com> Signed-off-by: Kevin Wolf <kwolf@redhat.com>
Diffstat (limited to 'qapi-schema.json')
-rw-r--r--qapi-schema.json3
1 files changed, 2 insertions, 1 deletions
diff --git a/qapi-schema.json b/qapi-schema.json
index 9482976943..37bbecab60 100644
--- a/qapi-schema.json
+++ b/qapi-schema.json
@@ -2037,7 +2037,8 @@
#
# Manually trigger completion of an active background block operation. This
# is supported for drive mirroring, where it also switches the device to
-# write to the target path only.
+# write to the target path only. The ability to complete is signaled with
+# a BLOCK_JOB_READY event.
#
# This command completes an active background block operation synchronously.
# The ordering of this command's return with the BLOCK_JOB_COMPLETED event