aboutsummaryrefslogtreecommitdiff
path: root/.travis.yml
diff options
context:
space:
mode:
authorHanna Reitz <hreitz@redhat.com>2021-10-06 17:19:35 +0200
committerVladimir Sementsov-Ogievskiy <vsementsov@virtuozzo.com>2021-10-07 10:42:40 +0200
commit08b83bff2a77e082d0b29680a40f0aaf9996bd16 (patch)
tree30a90847a438bfdd25a90165b9465a9b7773b559 /.travis.yml
parent401dd096ef9d19956977b371362107448575ef40 (diff)
job: Add job_cancel_requested()
Most callers of job_is_cancelled() actually want to know whether the job is on its way to immediate termination. For example, we refuse to pause jobs that are cancelled; but this only makes sense for jobs that are really actually cancelled. A mirror job that is cancelled during READY with force=false should absolutely be allowed to pause. This "cancellation" (which is actually a kind of completion) may take an indefinite amount of time, and so should behave like any job during normal operation. For example, with on-target-error=stop, the job should stop on write errors. (In contrast, force-cancelled jobs should not get write errors, as they should just terminate and not do further I/O.) Therefore, redefine job_is_cancelled() to only return true for jobs that are force-cancelled (which as of HEAD^ means any job that interprets the cancellation request as a request for immediate termination), and add job_cancel_requested() as the general variant, which returns true for any jobs which have been requested to be cancelled, whether it be immediately or after an arbitrarily long completion phase. Finally, here is a justification for how different job_is_cancelled() invocations are treated by this patch: - block/mirror.c (mirror_run()): - The first invocation is a while loop that should loop until the job has been cancelled or scheduled for completion. What kind of cancel does not matter, only the fact that the job is supposed to end. - The second invocation wants to know whether the job has been soft-cancelled. Calling job_cancel_requested() is a bit too broad, but if the job were force-cancelled, we should leave the main loop as soon as possible anyway, so this should not matter here. - The last two invocations already check force_cancel, so they should continue to use job_is_cancelled(). - block/backup.c, block/commit.c, block/stream.c, anything in tests/: These jobs know only force-cancel, so there is no difference between job_is_cancelled() and job_cancel_requested(). We can continue using job_is_cancelled(). - job.c: - job_pause_point(), job_yield(), job_sleep_ns(): Only force-cancelled jobs should be prevented from being paused. Continue using job_is_cancelled(). - job_update_rc(), job_finalize_single(), job_finish_sync(): These functions are all called after the job has left its main loop. The mirror job (the only job that can be soft-cancelled) will clear .cancelled before leaving the main loop if it has been soft-cancelled. Therefore, these functions will observe .cancelled to be true only if the job has been force-cancelled. We can continue to use job_is_cancelled(). (Furthermore, conceptually, a soft-cancelled mirror job should not report to have been cancelled. It should report completion (see also the block-job-cancel QAPI documentation). Therefore, it makes sense for these functions not to distinguish between a soft-cancelled mirror job and a job that has completed as normal.) - job_completed_txn_abort(): All jobs other than @job have been force-cancelled. job_is_cancelled() must be true for them. Regarding @job itself: job_completed_txn_abort() is mostly called when the job's return value is not 0. A soft-cancelled mirror has a return value of 0, and so will not end up here then. However, job_cancel() invokes job_completed_txn_abort() if the job has been deferred to the main loop, which is mostly the case for completed jobs (which skip the assertion), but not for sure. To be safe, use job_cancel_requested() in this assertion. - job_complete(): This is function eventually invoked by the user (through qmp_block_job_complete() or qmp_job_complete(), or job_complete_sync(), which comes from qemu-img). The intention here is to prevent a user from invoking job-complete after the job has been cancelled. This should also apply to soft cancelling: After a mirror job has been soft-cancelled, the user should not be able to decide otherwise and have it complete as normal (i.e. pivoting to the target). - job_cancel(): Both functions are equivalent (see comment there), but we want to use job_is_cancelled(), because this shows that we call job_completed_txn_abort() only for force-cancelled jobs. (As explained for job_update_rc(), soft-cancelled jobs should be treated as if they have completed as normal.) Buglink: https://gitlab.com/qemu-project/qemu/-/issues/462 Signed-off-by: Hanna Reitz <hreitz@redhat.com> Reviewed-by: Eric Blake <eblake@redhat.com> Reviewed-by: Vladimir Sementsov-Ogievskiy <vsementsov@virtuozzo.com> Message-Id: <20211006151940.214590-9-hreitz@redhat.com> Signed-off-by: Vladimir Sementsov-Ogievskiy <vsementsov@virtuozzo.com>
Diffstat (limited to '.travis.yml')
0 files changed, 0 insertions, 0 deletions